 |
 |
| Ulan Bator Station, as out train
waits in the platform |
|
 |
| The modern (1995) German built
coach, was still heated by a coal fired samavar. |
|
 |
 |
| Along the line between Ulan
Bator and the Chinese border |
 |
 |
 |
 |
| At the Chinese border, the train
is reguaged from Russian (5 foot) to Standard Gauge (4 ft 8.5in). This
involves lifting the train up in the air, and swaping the bogies over. |
|
 |
 |
| Along the line in China, the
Great Wall can be seen in the distance. |
 |
 |
|
 |
| Journey's end, Beijing Station |